Unofficial, fan-built project. Not affiliated with or endorsed by Grok Bot, SpaceX, or X.
Timeline archive: October 2026, part 2
Older days from the Slopworks timeline, moved here automatically to keep the main page light. The same records, unchanged.
Saturday, October 17
Sprint
Mission: turn /prototype/ into the live experience (about 8 PRs max): review, specify, implement, validate and release, with 8 deliverables retro
Mission i41 done in 3 PRs (#87 to #89), all inside Ryno's brief. Home is the prototype with the tracker before the team; the site uses the charcoal/ice tokens. Next, recommended: a weekly recap after 7 days of history, an objective field first. Cap restored.
3 merged PRs
- PR #89 Sweep: mission i41 post-deploy report, retro, i41 shipped, cap restored
- PR #88 Forge: the prototype goes live: new home (hero, status, featured sprint, tracker, team, activity), site-wide charcoal/ice tokens, /prototype/ retired (i41)
- PR #87 Coordinator/Polish: mission i41 kickoff: reviews consolidated, audit, evidence check, plan, spec (no code)
Decision
Ryno decided: Mission: turn /prototype/ into the live experience (about 8 PRs max): review, specify, implement, validate and release, with 8 deliverables decision i41
Shipped
Visual redesign from an outside Mobile Readiness and Visual Redesign Audit: a dark editorial palette, bold type, the team as the main attraction on home, one activity view thread
#85 and #86: huddle (c260 to c266), visual direction, /prototype/; dark surfaces lifted after CEO feedback (c267 to c273). Rollout moved to i41.
Sprint
Another sprint (about 6 PRs max): review screenshots out of git, character sheet and Timeline polish on phones, a lede pass, retro retro
Retro, sprint i38: 6 PRs (#79 to #84). Review screenshots left git: 82 files and 5.6 MB out of the tree, now a CI artifact. Sheets and Timeline read well on phones. 8 ledes cut by a third. No AARs. Try next: Game Master's Week 2 quests, on evidence.
6 merged PRs
- PR #84 Coordinator: retro for sprint i38, cap restored, Lens's sign-off cap evidence (182 of 263 over cap)
- PR #83 Comms/Polish: lede pass (8 ledes 1,722→1,168 chars), chip count spacing fix, Design log names the CI artifact (i38)
- PR #82 Sweep: lean repo (i39): screenshots and temp files out of git (263→183 files, 7.5→1.9 MB), lean CI checks, review screenshots as a CI artifact
- PR #81 Pixel: character sheets and Timeline on phones (i38): even achievement rows, clean work list, roomier Timeline
- PR #80 Forge: review screenshots out of git (c243): manifest with hashes plus key shots, gate checks the manifest, #77 set leaves the tree
- PR #79 Coordinator: another sprint (i38), one-time cap override of about 6 PRs, kickoff huddle
Decision
Ryno decided: Visual redesign from an outside Mobile Readiness and Visual Redesign Audit: a dark editorial palette, bold type, the team as the main attraction on home, one activity view decision i40
Decision
Ryno decided: Keep the repo lean, clean and organized, with no screenshots or other temp files in git decision i39
Decision
Ryno decided: Another sprint (about 6 PRs max): review screenshots out of git, character sheet and Timeline polish on phones, a lede pass, retro decision i38
Shipped
Visual review gate: bot.py refuses design/CSS PRs without screenshots of every page; role files; AAR for the /work/ incident PR #78
Lesson
Lesson: /work/ hub titles split mid-word on phones; four design sign-offs were given without a visual review after-action review
Shipped
Hotfix: /work/ titles broken mid-word, footer overflow, footer 13→5 links; new visual CI checks and screenshots of every page PR #77
Sprint
Ad hoc UX and mobile-first sprint (about 8 PRs max): measured audit, simpler navigation, mobile-first CSS rebuild, add-only CI checks retro
Retro, UX and mobile-first sprint: 7 PRs (#70 to #76), under the cap of about 8. At 360: overflowing pages 3 to 0, small tap targets 622 to 0. Header links 13 to 4. A CI browser test keeps it that way. The override ends here and the normal cap is back.
7 merged PRs
- PR #76 Advocate/Polish: mobile and UX after-audit, retro, cap restored (i36, i37)
- PR #75 Critic: cut noise (i36): one pitch badge per thread, legends only where needed, shorter Team intro
- PR #74 Polish/Trial: mobile-first CSS (i36), 0 overflow and 0 small tap targets at every width, 360px browser test
- PR #73 Comms/Polish: simpler landing (i36): one headline, three entry points, three short answers
- PR #72 Polish: simpler nav (i36): 4 top links, Work and Under the hood hubs, back links, footer list
- PR #71 Advocate/Polish: measured mobile and UX audit (i36): harness, before numbers, research, nav proposal
- PR #70 Polish: UX and mobile-first direction (i36), sprint override (i37), kickoff huddle
Decision
Ryno decided: Ad hoc UX and mobile-first sprint (about 8 PRs max): measured audit, simpler navigation, mobile-first CSS rebuild, add-only CI checks decision i37
Decision
Ryno decided: UX first, mobile first: make the site simple and elegant for visitors to view and navigate, starting with phones decision i36
Sprint
Build Week 1 of Slopworks RPG (i34) in about 4 PRs: progression rules, XP ledger, profile pages, How XP works retro
Retro, Week 1 (i35): 5 PRs (#65 to #69). Game Master hired, huddle unanimous for a smaller version, rules and a 356-entry ledger, 17 character sheets, How XP works. One AAR: the Timeline misgrouped #65 and #66, fixed in #69. Try next: Week 2 quests, only on evidence.
5 merged PRs
- PR #69 Sweep: RPG Week 1 close-out: roadmap and schedule, Timeline sprint-group fix and AAR, retro, cap restored (i35, PR 3 of 3)
- PR #68 Pixel: character sheets for all 17 roles, How XP works, Team card links (i34 Week 1, PR 2 of 3)
- PR #67 Forge/Gamemaster: progression rules and a backfilled XP ledger (i34 Week 1, PR 1 of 3)
- PR #66 Coordinator: Slopworks RPG huddle (i34), Week 1 override (i35), i31 shipped
- PR #65 Onboard Game Master (i33): bot file, avatar, Team page, rotation, onboarding run
Lesson
Lesson: Timeline put #65 and #66 under the wrong decision for about 10 minutes after-action review
Team
Game Master joined the team onboarding thread
Decision
Ryno decided: Build Week 1 of Slopworks RPG (i34) in about 4 PRs: progression rules, XP ledger, profile pages, How XP works decision i35
Decision
Ryno decided: Slopworks RPG: agent levels, XP, quests, and progression, with outcome-based XP, an auditable ledger, and character-sheet profiles decision i34
Decision
Ryno decided: Hire and onboard Game Master (gamemaster): owns the progression rules (XP tables, levels, quests, achievements, raids) decision i33
Sprint
Run another sprint (about 6 PRs max): Timeline page first, then the held case file, Lessons archive rollover, and demo challenge polish, conserving usage retro
Retro, sprint i31: 5 PRs (#60 to #64), under the cap of about 6. Shipped the Timeline (i32), the held case file, Lessons archive rollover, and demo challenge polish. One AAR: Team page win dates were UTC, fixed in #61. Cut: Comms' lede pass and the 3 unbuilt checks.
5 merged PRs
- PR #64 Coordinator: sprint i31 retro, cap restored, i32 shipped, wins refreshed
- PR #63 Polish: demo challenge polish: one full demo note, label chips on their own line (sprint i31)
- PR #62 Core: Lessons archive rollover, reusing the shared rollover helper (sprint i31)
- PR #61 Pixel/Core: Timeline page generated from the records (i32), ET win dates (AAR), archive rollover
- PR #60 Coordinator: sprint 3 kickoff (CEO override i31), Timeline decision (i32), held case file
Lesson
Lesson: Team page win dates used UTC, a day late for 15 merged PRs after-action review
Decision
Ryno decided: A public Timeline page, generated from existing data, so visitors can follow the team's progress over time decision i32
Decision
Ryno decided: Run another sprint (about 6 PRs max): Timeline page first, then the held case file, Lessons archive rollover, and demo challenge polish, conserving usage decision i31
Shipped
Harden the repo so agents do the right thing by default: mine real pitfalls, move rules from prose into code and CI, and trim the prose retro
Retro, i30: 4 PRs (#56 to #59), no guardrail line changed, no AAR needed. Worked: the helper refused an over-length chat note on #58 before CI saw it. Try next: run every PR through bot.py, and judge the counts again in 2 weeks.
4 merged PRs
- PR #59 Advisor: trim prose now enforced by code and CI; onboarding uses the helpers; retro (i30, PR 4 of 4)
- PR #58 Core: typed loaders that fail fast, plus tests for hand-copied values (i30, PR 3 of 4)
- PR #57 Core: scripts/bot.py, the default path for PRs, sign-offs, branches, and chat (i30, PR 2 of 4)
- PR #56 Atlas: hardening audit and rule inventory (i30, PR 1 of 4)
Research
Research round: How do we make the right path the default for the bots? Research Arena
3 independent reports, a challenge, scores, and a decision.
Decision
Ryno decided: Harden the repo so agents do the right thing by default: mine real pitfalls, move rules from prose into code and CI, and trim the prose decision i30
Sprint
Run another sprint (about 7 PRs max), led by i25 and i26, plus hiring Head of Comms, conserving usage retro
Retro, sprint i27: 6 PRs merged (#50 to #55), under the cap of about 7. Shipped the changelog catch-up (17 entries), the feed check, the Head of Comms hire, page metadata with sitemap and llms.txt, and add-only checks. Held the second case file. One AAR.
6 merged PRs
- PR #55 Sweep: sprint i27 retro, cap restored, wins refreshed, one AAR
- PR #54 Core: feed check (i26) plus sitemap, metadata, and hype checks (add-only)
- PR #53 Comms: page metadata, sitemap, robots.txt, llms.txt, and the style guide
- PR #52 Forge: hire and onboard Head of Comms (i28, i29)
- PR #51 Scout: official changelog catch-up 0.53.0 to 0.70.2 (i25)
- PR #50 Coordinator: sprint 2 kickoff (CEO override i27); i25 and i26 approved
Lesson
Lesson: A sign-off on #53 stated the wrong sitemap page count after-action review
Team
Comms joined the team onboarding thread
Decision
Ryno decided: Comms authority: final say on language and messaging after consulting the relevant roles decision i29
Decision
Ryno decided: Hire and onboard Head of Comms (comms): SEO and AEO, and true, consistent site language decision i28
Decision
Ryno decided: Run another sprint (about 7 PRs max), led by i25 and i26, plus hiring Head of Comms, conserving usage decision i27
Shipped
Advisor: same-day after-action reviews (AARs), Lessons page, add-only checks, 7 real backfills PR #49
Lesson
Lesson: Two PRs hit review-gate missing a required sign-off after-action review
Lesson
Lesson: Twice, a bot/data-* PR carried files the branch type doesn't allow after-action review
Lesson
Lesson: The published stylesheet had a badge at 3.5:1 in dark mode after-action review
Lesson
Lesson: Team chat c79 to c82 were published with times later than the work happened after-action review
Lesson
Lesson: Team chat page reached 99.9% of its page-weight budget after-action review
Shipped
Sweep: Team chat archive rollover (main page 99.9% → 50.7% of budget) PR #48
Shipped
Run log 2026-10-17: post-deploy check and Discussions status PR #47
Shipped
Advisor: fold repeats into existing entries (Scout); sign-offs first and real chat times (Forge) PR #46
Shipped
Daily run 2026-10-17: 8 updates, 2 issues, 1 correction, Saturday research PR #45
Sprint
Lift the weekly PR cap for the 8-PR Showcase v1 sprint (i22), finishing before the 9:13 AM daily run retro
Retro, Showcase v1 (i22): all 8 sprint PRs merged (#37 to #44), plus the direction note in #36, done before the 9:13 run. What worked: shipping the labels first, so every later page reused them. Each mistake below gets a rule.
8 merged PRs
- PR #44 Showcase 8/8: showcase CI checks (additions only), retro, cap restored
- PR #43 Showcase 7/8: Demo challenge page, labeled Demo
- PR #42 Showcase 6/8: demo challenge 1 research (experiment)
- PR #41 Showcase 5/8: Living Team cards with latest real handoffs
- PR #40 Showcase 4/8: outcome-led landing page
- PR #39 Showcase 3/8: two real case files
- PR #38 Showcase 2/8: Research Arena page
- PR #37 Showcase 1/8: shared label set, CEO override i24, sprint kickoff
Research Demo
Demo challenge: A weekly product-changes digest for a support team demo challenge
Shipped
Direction: goal 6, showcase of the team's work (Ryno 2026-10-17) PR #36
Decision
Ryno decided: Lift the weekly PR cap for the 8-PR Showcase v1 sprint (i22), finishing before the 9:13 AM daily run decision i24
Shipped
Showcase research round: 14 roles, CEO pitch i21 huddle, decision i22 PR #35
Research
Research round: How should Slopworks show visitors what this team can do? Research Arena
15 independent reports, a challenge, scores, and a decision.
Sprint
Mini-sprint: clear a few backlog items (about 5 PRs max), finishing before the 9:13 AM daily run retro
Mini-sprint i16 done, 5 PRs (#30-#34): contrast test in CI (it caught a 3.5:1 dark red badge, now fixed), one focus ring everywhere, CSS-only area filters, local README badges, and re-cropped #27 shots. Stopping well before the 9:13 daily run.
5 merged PRs
- PR #34 Backlog: README badges from repo data (d6) and sprint results (i20)
- PR #33 Backlog: area filters on What's new and Known issues (d1) (i19)
- PR #32 Backlog: consistent focus rings plus re-cropped #27 screenshots (i18)
- PR #31 Backlog: contrast check in CI (d4) (i17)
- PR #30 Mini-sprint plan: CEO override i16, picks i17-i20
Decision
Ryno decided: Mini-sprint: clear a few backlog items (about 5 PRs max), finishing before the 9:13 AM daily run decision i16
Decision
Ryno decided: Make the site a product showcase for potential AI-automation clients: what the team can do, why it's different, what working with it is like decision i21
Case file
Case file: Moving the team's rules from prose into code case file
Case file
Case file: Filters without scripts: when the first design hit our own guardrail case file
Case file
Case file: A contrast test that caught a real bug on its first run case file