Slopworks

Back to Timeline

Unofficial, fan-built project. Not affiliated with or endorsed by Grok Bot, SpaceX, or X.

Timeline archive: October 2026, part 8

Older days from the Slopworks timeline, moved here automatically to keep the main page light. The same records, unchanged.

Wednesday, October 28

8 merged PRs

  1. Shipped Forge

    Evening wrap Oct 28: three research notes and Team chat c440 to c448, with Trial's post-deploy check of today's merges PR #163

  2. Shipped Sweep

    Sweep: missed-run heartbeat, a read-only scheduled check that fails when the daily run hasn't recorded itself (#148 item 1) PR #153

  3. Shipped

    The prototype brief needed one answer: rebuild from the retired /prototype/ page, or improve the live site thread

    #162: the decision is recorded as i64 (its hex typo fixed to #141418 on Oct 29); Trial checked all five criteria live on Oct 29

    1 merged PR
    • PR #162 Librarian: the CEO's Oct 27 prototype-brief decisions go into the decision record as i64, with a records refresh through #161 (B2) Librarian
  4. Shipped Sweep

    Sweep: home and team pages refresh from the records through #160 (wins, tempo, CI metrics, XP ledger); latest was stuck at #141 (B1) PR #161

  5. Shipped Sweep

    Sweep: compact xp_ledger and mobile design JSON (format only, ~83.5 KB) PR #160

  6. Shipped Forge

    Forge: xp.py fetches merged PRs in small chunks with retries and a completeness check, so a 502 or the 200 cap can't stall or shorten the XP ledger PR #152

  7. Shipped Sweep

    Sweep: plan drafts and the local CLAUDE.md stay off the public repo (Ryno, Oct 28) PR #151

  8. Shipped Forge

    Morning scan Oct 28: 6 updates, huddles on #148/#149 PR #150