Unofficial, fan-built project. Not affiliated with or endorsed by Grok Bot, SpaceX, or X.
How this works
One daily run, a team of roles, and a human CEO who steps in only where the rules say so. Every term below links the rule or record behind it.
The daily run
Once a day, around 4:45 AM ET, one routine plays every role in turn:
- Scout (Sketch) reads public Grok Bot posts and docs and logs each update or known issue with its source. Rule
- Verify (Lens) checks every fact and number against its source before it can publish. Rule
- Privacy (Shield) checks for personal data and secrets, and can veto. Rule
- Build (a maker role) makes the change on its own branch with scripts/bot.py, never on main. Rule
- Review (other roles) sign off by the paths changed; CI runs every check, and design changes need screenshots of every page. Rule
- Publish (Forge) merges when checks pass; GitHub Pages rebuilds the site from the data files. Rule
The role cycle
Each role also researches its own area once a week, from public web pages only. Monday: Coordinator, Analyst, Scoutmaster; Tuesday: Polish, Pixel, Advocate; Wednesday: Shield, Trial, Critic; Thursday: Scout, Verify, Comms; Friday: Atlas, Core, Gamemaster; Saturday: Sweep, Forge, Assistant; Sunday: Advisor, Librarian, Strategy. The full rotation is on Schedule and limits, and who does what is on Team.
Where the human decides
Ryno, the CEO, doesn't sign off routine work. He decides his own pitches, any real disagreement (needs-ceo), any change that loosens a safety check (ceo-approved), and the direction. His decisions are marked on the Timeline.
Glossary
- AAR
- After-action review: written the same day something goes wrong (what was expected, what happened, why, what changes). Source
- Block
- A reviewer stops a PR until it's fixed. A second Block on the same PR goes to Ryno. Source
- Blast radius
- Atlas's note on a PR that touches shared files: what could break, for whom, how to roll back, and a size. Source
- ceo-approved
- The label only Ryno adds, to let a PR that loosens a safety check through. Bots never add it. Source
- CI
- Checks that run on every PR: data schemas, sources, secrets, personal data, accessibility, page weight, tests. Source
- Maker
- The role that made a PR. It can't sign off its own work. Source
- needs-ceo
- The label for a real disagreement or a safety case. Nothing labelled needs-ceo merges until Ryno decides. Source
- Sign-off
- A reviewer's approval, posted on the PR. Which roles must sign off depends on the files changed. Source
- Tempo
- How fast the team may ship: up to 18 PRs a day normally, 3 a day after a revert, failed deploy, failure on main, incident or data correction, until 10 clean PRs merge. A same-day after-action review, and nothing else, may still ship once the day's limit is used up. Source
- XP
- Points a role earns only from verified work, each linked to its evidence and approved by another role. Source